Tanzania, Sweden agree to deepen ties in digital economy, energy and transport infrastructure

STOCKHOLM: FOREIGN Affairs Minister and East African Cooperation,Dr Mahmoud Thabit Kombo has held talks with Swedish Foreign Minister, Maria Malmer Stenergard, aimed at strengthening bilateral relations and cooperation between Tanzania and Sweden.
The discussions focused on expanding economic cooperation through trade partnerships, investment, and the exchange of experience, skills and technology.
During the talks, Ambassador Kombo encouraged Swedish companies to invest in Tanzania’s manufacturing sector, agricultural processing and strategic minerals to add value to the country’s resources and promote economic growth.
ALSO READ: Tanzania, Sweden agree to deepen bilateral ties in trade, investment, education, technology
The two ministers also agreed to strengthen cooperation in environmentally friendly technologies, the digital economy, renewable energy and sustainable transport infrastructure, including the Standard Gauge Railway (SGR) and the Dar es Salaam Rapid Transit (DART) system.
They further explored opportunities for collaboration in research and innovation, cybersecurity, and capacity building for Tanzanian producers to enable their products to meet European Union market standards.
The ministers also discussed the importance of reducing post-harvest losses through the adoption of technology and improved agricultural production and storage practices.




Estimated Cost of Building an Underground Tunnel from Dar es Salaam to Zanzibar
– Estimated tunnel length:50–60 km (subject to marine surveys).
– Estimated total construction cost: US$9.3–19.5 billion.
– Equivalent in Tanzanian Shillings: TZS 24.2–50.7 trillion.
– Undersea tunnel construction: US$6–12 billion.
– Ventilation and safety systems: US$500 million–1 billion.
– Electricity and lighting:US$200–400 million.
– Entrance and exit infrastructure:US$300–600 million.
– Emergency facilities:US$300–500 million.
-Engineering studies and contingencies: US$2–5 billion.
Expected Economic Benefits
– Faster movement between Dar es Salaam and Zanzibar.
– Increased tourism and investment.
– Improved transportation of agricultural and industrial products.
– Job creation during construction and operation.
– Increased trade between Mainland Tanzania and Zanzibar.
– Strengthened national economic integration. Tanzaniatravel guide
Recommendation: Conduct a feasibility study to determine the most economical and technically viable option.
Indicative overall budget: TZS 24–51 trillion.
Note: This is a preliminary conceptual estimate, not an official engineering or government project budget.
Estimated Cost of Building an Underground Tunnel from Dar es Salaam to Zanzibar
– Estimated tunnel length:50–60 km (subject to marine surveys).
– Estimated total construction cost: US$9.3–19.5 billion.
– Equivalent in Tanzanian Shillings: TZS 24.2–50.7 trillion.
– Undersea tunnel construction: US$6–12 billion.
– Ventilation and safety systems: US$500 million–1 billion.
– Electricity and lighting:US$200–400 million.
– Entrance and exit infrastructure:US$300–600 million.
– Emergency facilities:US$300–500 million.
-Engineering studies and contingencies: US$2–5 billion.
Expected Economic Benefits
– Faster movement between Dar es Salaam and Zanzibar.
– Increased tourism and investment.
– Improved transportation of agricultural and industrial products.
– Job creation during construction and operation.
– Increased trade between Mainland Tanzania and Zanzibar.
– Strengthened national economic integration. Tanzaniatravel guide.
Recommendation: Conduct a feasibility study to determine the most economical and technically viable option.
Indicative overall budget: TZS 24–51 trillion.
Note: This is a preliminary conceptual estimate, not an official engineering or government project budget.
Estimated Cost of Building an Underground Tunnel from Dar es Salaam to Zanzibar
– Estimated tunnel length:50–60 km (subject to marine surveys).
– Estimated total construction cost: US$9.3–19.5 billion.
– Equivalent in Tanzanian Shillings: TZS 24.2–50.7 trillion.
– Undersea tunnel construction: US$6–12 billion.
– Ventilation and safety systems: US$500 million–1 billion.
– Electricity and lighting:US$200–400 million.
– Entrance and exit infrastructure:US$300–600 million.
– Emergency facilities:US$300–500 million.
-Engineering studies and contingencies: US$2–5 billion.
Expected Economic Benefits
– Faster movement between Dar es Salaam and Zanzibar.
– Increased tourism and investment.
– Improved transportation of agricultural and industrial products.
– Job creation during construction and operation.
– Increased trade between Mainland Tanzania and Zanzibar.
– Strengthened national economic integration. Tanzaniatravel guide
Recommendation: Conduct a feasibility study to determine the most economical and technically viable option.
Indicative overall budget: TZS 24–51 trillion.
Note: This is a preliminary conceptual estimate, not an official engineering or government project budget